Figure 1: Site conditions before construction, notice erosion of slope. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 2: First a retaining wall was constructed to prevent future erosion. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 3: The Infiltration Trench was outlined and excavated with a backhoe. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 4: Once completed, the excavation was lined with a geotextile fabric. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 5: Washed crushed stone filling the bed. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 6: Installation of perforated distribution pipe. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 7: 6x6" timbers were used to outline the Trench and a small concrete pad was poured. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 8: Completed Infiltration Trench. |
|
|
|
|
|
|
|
|