Figure 1: View from Sheehan Hall of initial stages of excavation. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 2: Looking into the Quad from Bartley Hall. Contractors are beginning to excavate the lower infiltration bed. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 3: Continued excavation of lower infiltration bed. Chalk outline denotes perimeter of the bed. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 4: The excavation of the central infiltration bed nearing completion. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 5: Illustration of the infiltration beds with the #4 Baffle Stone in place. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 6: Another view of the infiltration beds with the #4 Baffle Stone. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 7: Notice the filter fabric separating the underlying soil from the stone. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 8: Moisture meters after installation in soil wall just below base of infiltration bed. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 9: Moisture meters at varying depths in soil wall. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 10: A lysimeter prior to installation. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 11: Layout of installed lysimeters at the base of the infiltration bed. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 12: Final grading prior to the pouring of the pervious concrete. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 13: First pour of pervious concrete. A drum roller was used for compaction and finishing. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 14: View of the first day’s pour. Note the plastic covering on completed areas. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 15: Second day of pouring. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 16: Last day of pouring. Reinforcement used for standard concrete. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 17: Overhead view of completed project. |
|
|
|
|
|
|
|
|