Figure 1: Overview of entire site, completely mowed to prepare for grading. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 2: Site overview, looking from the inlet structure to the outlet structure. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 3: Site was graded to lengthen flow path and increase residence time. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 4: A worker installs the caging for the gabion wall to retain water in the sediment forebay. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 5: Pre construction shot of the outlet structure. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 6: The same outlet structure with a gabion berm installed. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 7: An ultrasonic transducer is added on top of the wooden weir. |
|
|
|
|
|
|
|
|
|
|
|
|
Figure 8: The final step--planting various wetland species in the graded basin. |
|
|
|
|
|
|
|
|