Gallery

    Print This Page

    Please click on each image below to view a larger version of the image in a separate window.

    Dr. Dinehart investigating open web steel joists
    Dr. Dinehart investigating open web steel joists

    Preparation of 
						a cement paste mixture
    Preparation of a cement paste mixture

    Material 
					testing - shrinkage molds
    Material testing - shrinkage molds

    Rigging for 
					specimen placement
    Rigging for specimen placement

    Bridge deck 
					fatigue study
    Bridge deck fatigue study

    Marking cracks 
					on a GFRP reinforced concrete beam
    Marking cracks on a GFRP reinforced concrete beam

    Soldering 
					strain gages for concrete flexural test
    Soldering strain gages for concrete flexural test

    Girder-slab 
					composite floor system
    Girder-slab composite floor system

    Preparation of 
					instrumentation on girder-slab system
    Preparation of instrumentation on girder-slab system

    Test setup 
					assembling
    Test setup assembling

    Recording 
					measurements on a continuous GFRP reinforced concrete beam
    Recording measurements on a continuous GFRP reinforced concrete beam

    Casting 
					shrinkage samples
    Casting shrinkage samples

    Information board by the entrance
    Information board by the entrance

    Entrance to the SETRL
    Entrance to the SETRL

    need caption
    Cross on the building